NOTE:
Before performing the following inspection, make sure to follow the procedure as indicated in the troubleshooting flowchart. (See HOW TO USE THIS MANUAL.)
1. Remove the neutral switch. (See NEUTRAL SWITCH REMOVAL/INSTALLATION [M15M-D].)
2. Verify that the continuity between neutral switch terminals 1A and 2A is as indicated in the table.
If not as indicated in the table, replace the neutral switch. (See NEUTRAL SWITCH REMOVAL/INSTALLATION [M15M-D].)(See NEUTRAL SWITCH REMOVAL/INSTALLATION [P66M-D].)
If the monitor item condition/specification (reference) is not within the specification, even though there is no malfunction, perform the “Circuit Open/Short Inspection”.
1. Disconnect the PCM connector. (See PCM REMOVAL/INSTALLATION [LF].)
2. Inspect the following wiring harness for open or short circuit (continuity Inspection).
If there is no continuity, there is an open circuit. Repair or replace the wiring harness.
Neutral switch terminal 2A and PCM terminal 1X
Neutral switch terminal 1A and body ground
If there is continuity, there is a short circuit. Repair or replace the wiring harness.
Neutral switch terminal 2A and body ground