1. Remove the plug hole plate. (See PLUG HOLE PLATE REMOVAL/INSTALLATION [LF].)
2. Remove the battery cover.
3. Disconnect the negative battery cable. (See BATTERY REMOVAL/INSTALLATION [LF].)
4. Move the variable tumble solenoid valve (AT), slightly out of the way. (See VARIABLE TUMBLE SOLENOID VALVE REMOVAL/INSTALLATION [LF].)
5. Remove in the order indicated in the table.
6. Install in the reverse order of removal.
1
Connector
2
Vacuum hose
3
Variable intake air solenoid valve